Premium Cotton Double Bed Sheet with Peacock Print & 2 Pillow Covers

(0 reviews)

Inhouse product


Price
Rs445.00 Rs890.00 /pc -50%
Quantity
(5200 available)
Total Price
Share
Top Selling Products

Reviews & Ratings

0.00 out of 5.0
(0 reviews)
There have been no reviews for this product yet.

Bring elegance and charm to your bedroom with this beautiful cotton double bed sheet set featuring a stunning royal peacock design. The vibrant teal green base with floral detailing and intricate peacock motifs adds a luxurious touch to your home décor. Made from high-quality 100% cotton fabric, this bed sheet is soft, breathable, and perfect for year-round comfort.

The set comes with 2 matching pillow covers designed with complementary peacock patterns, enhancing the overall look of your bed setup. Its fade-resistant colors and durable stitching ensure long-lasting use while maintaining a fresh and stylish appeal.


Key Features:

  • Material: 100% Cotton

  • Size: Double Bed (Suitable for King/Queen beds)

  • Design: Peacock print with floral patterns

  • Colors: Teal Green, Beige, Multicolor highlights

  • Set Includes: 1 Double Bed Sheet + 2 Pillow Covers

  • Soft, breathable, and skin-friendly fabric

  • Easy to wash and maintain (machine washable)

  • Fade-resistant and long-lasting print


Ideal For:

✅ Everyday use
✅ Gifting (Housewarming, Wedding, Festivals)
✅ Adding a royal and traditional touch to your bedroom décor

Frequently Bought Products

Top Selling Products
All categories
Flash Sale
Todays Deal